For hotels and large-scale projects in Türkiye, the Caucasus, Central Asia, Africa and Eastern Europe. Budget, contract and delivery discipline from an architect and project manager who knows both sides of the contract.
27+years of experience
7countries
$3B+project value
156,000 m²largest terminal
First step · free
3 risks in 48 hours
We sign an NDA. You send a tender, contract or latest payment certificate. Within 48 hours you get the 3 riskiest items, their likely impact and what to do, on one written page. No sales meeting, no obligation.
Prefer to talk first? A free 30-minute online call. I listen to your project and tell you plainly which product fits, or that you need none.
Start here
Which side are you on?
For company boards:
Independence ruleNever advising both owner and contractor on the same project.
ConfidentialityAn NDA is signed before any document is shared; no information from former employers is ever used.
Your data stays with youFigures you enter in the tools stay on your own device and are never sent anywhere.
You receive the 3 riskiest items on one written page.
2 · Pilot or diagnosis
Fixed fee
A bid, contract or profitability diagnosis that ends in a one-page management report.
3 · Fix
Online or on site
Issues found are fixed together with your team.
4 · Sustain
Monthly retainer
Monthly audit, contract administration or owner's representation.
01 · Services
Consulting products
Every product has a fixed duration, defined deliverables and a success measure. Work is fixed-fee. Ranges depend on project size; the exact price is confirmed in writing once scope is clear. Prices are in US dollars, excluding VAT; travel and accommodation for out-of-town and international visits are invoiced separately at cost. The first step is always the free "3 risks in 48 hours" review.
P1
Contractor
Bid Review
Loss-making bids: missed quantities, currency and inflation risk not priced in, thin contingency.
BOQ and unit rate review
Currency, inflation and time risk analysis
Red-flag list and realistic tender margin
Duration
5 working days
Success measure
Tender margin explained item by item
Price range
$3,500 – 6,000
P2
Contractor
Cash & Bond Plan
Cash squeeze: late payments, full bond facilities, delayed subcontractor payments.
Monthly cash flow curve (S-curve)
Bond facility need and bank plan
Negotiating position on advance and payment terms
Duration
2 weeks
Success measure
Funding gap for the first 6 months known up front
Price range
$5,000 – 8,000
P3
ContractorOwner / investor
Contract Health Check
Missed notice periods, extra work on verbal instructions, unrecorded extension-of-time entitlements.
Contract summary and notice calendar
Variation (VO) and extension of time (EOT) register
Monthly contract administration (optional)
Duration
1 week + monthly
Success measure
No notice period missed; every extra instructed in writing
Price range
$3,000 – 5,000 + optional monthly $1,500 – 3,000
P4
ContractorBoard
Project Profitability Diagnosis
Margin erodes unnoticed; actual and committed costs are not separated.
Budget, actual and committed cost by cost group
Estimate at completion (EAC), CPI and SPI
Margin recovery plan
Duration
2 weeks
Success measure
Forecast margin and recoverable amount in numbers
Price range
$5,000 – 9,000
P5
Contractor
Package Strategy
Scope gaps and orphaned work between subcontract packages.
Scope matrix and interface matrix
Package budget ceilings
Tender and subcontract templates
Duration
2–3 weeks
Success measure
No orphaned scope
Price range
$6,000 – 10,000
P6
ContractorOwner / investor
First 90 Days Set-up
Works start before the team, authority and reporting system are in place.
Management team structure and authority matrix
Baseline programme and monthly report format
Document control and correspondence procedure
Duration
90 days
Success measure
First payment certificate on time and undisputed
Price range
$15,000 – 25,000 (90 days)
P7
ContractorOwner / investor
Handover Plan
Snagging starts in the last month; final acceptance and bond release slip by months.
Quality plan and inspection & test plans (ITP)
Snagging method, testing and commissioning programme
Final acceptance roadmap
Duration
From one third of the programme
Success measure
Final acceptance on the planned date
Price range
$3,000 – 5,000 per month
P8
Owner / investor
Owner's Representation
The investor has no trusted eyes on site; payments and variations are paid unverified.
Independent verification of payments and variations
The board cannot see real project profitability; investment decisions run on instinct.
Portfolio profitability dashboard
6-monthly financial discipline audit
Investment share and new market assessment
Duration
Quarterly
Success measure
Every project's margin on one page
Price range
$4,000 – 7,000 per quarter
Door 1 · free
3 risks in 48 hours
Document review under NDA
One-page written review
No obligation
Door 2
Pilot or diagnosis
Pilot: a narrow, fixed, low-fee first job (e.g. one tender review): $1,500 – 2,500
Diagnosis: P1, P3 or P4
One-page management report
Door 3
Monthly retainer
Monthly audit and contract administration
Owner's representation
Price ranges
What sets the price?
Scope
Number of documents and work packages to review; project size (m², keys, contract value).
Duration and intensity
Delivery time and days committed per week. A tight deadline means the same work done more intensively.
Where the work happens
Online or on site; number of site visits and the country. Travel and accommodation are invoiced separately at cost.
Reporting and language
Report language (Turkish, English, French) and whether a board or lender presentation is needed.
Low end of the range: one project, clear scope, online work. High end: many packages, tight deadline, on-site work. The exact price is given in writing, as a fixed fee, once scope is clear.
Independence rule: never advising both owner and contractor on the same project. A conflict-of-interest check is made before every new engagement.
02 · Evidence
Case studies
Each case follows the same order: challenge, approach, result. Figures come from project records; cost details are withheld for confidentiality.
Turkmenistan · 2014–2016
Ashgabat International Airport
My role: Finishing Works Manager (Polimeks). Responsible for all architectural finishes, interface coordination and the site team.
$2.5Bproject value
156,000 m²terminal
15,000workers
3continents of supply
Challenge
A fixed opening date, a multi-contractor site and materials from three continents. A one-week slip in finishes threatened the opening directly.
Approach
Finishes were split into zones and packages. Material logistics were tied to the programme. Structural, MEP and airport-systems interfaces were coordinated from one desk, with 500 staff and 15,000 workers.
Result
Finishes were delivered on the government-fixed deadline. The terminal opened with capacity for 14 million passengers a year.
Consulting equivalent: Package Strategy (P5), First 90 Days Set-up (P6)
Gabon · 2014
Presidential Mausoleum and Mosque Complex
My role: Fit-out Supervisor (ENKA–Bouygues JV). Subcontractor coordination, MEP interfaces, budget, site planning and material logistics.
$75Mproject value
20months
1,000,000LTI-free hours
Challenge
An ENKA–Bouygues joint venture. Calacatta stone, handmade mosaic and fibre-optic ceilings had to be installed at a remote site with a weak supply chain.
Approach
Subcontractor coordination, MEP interfaces, budget control, site planning and material logistics were run in one plan, with daily quality and HSE follow-up.
Result
Completed in 20 months. The first 1,000,000 LTI-free work hours in Gabon's history. Presidential Certificate of Recognition awarded.
Consulting equivalent: Handover Plan (P7), Package Strategy (P5)
Georgia · 2019–2024
Tbilisi Marriott Spa, Wellness & Golf Club
My role: Project Manager (Anagi Construction). Full lifecycle delivery; coordination between investor, brand and design teams; bridging international standards and local contractor capability.
54,000 m²built area
176rooms
40 halandscaping
5key parties
Challenge
Investor, Marriott, architect (Dephani), interior designer (Hat Design) and structural engineer (Progress LLC) each had different expectations. The scope included a spa, 3 restaurants and a cable car.
Approach
Architectural interface coordination and multi-party stakeholder management ran across the full lifecycle, with works checked against Marriott brand standards.
Result
The 54,000 m² hotel was delivered to Marriott standards with 176 rooms, spa, wellness, 3 restaurants, a cable car and 40 ha of landscaping.
Consulting equivalent: Owner's Representation (P8), Contract Health Check (P3)
03 · About
Hüray Özkul
I am an architect turned project manager. Over 27 years I have led hotel, airport, mixed-use, healthcare and monumental projects on the contractor side in seven countries. Today I work as an independent owner's representative and development consultant. Because I know both sides of the contract, I can show owners and contractors alike where the other side will stand. I have hands-on experience working to hotel brand standards: at the Tbilisi Marriott (2019–2024) I checked the works against Marriott brand standards and ran coordination between the investor, the brand, the architect and the interior designer.
EducationBSc Architecture, Yıldız Technical University (1998)
NDA. A mutual NDA is signed before any documents change hands; your own template can be used.
Conflict check. Before every engagement, I check whether I serve the other party on the same project and confirm the result to you in writing.
One-side rule. Never advising both owner and contractor on the same project.
Former employers. No confidential information, prices or documents of former employers are ever used. Only experience and method are carried over.
Document return. Documents are used only for that engagement, stored encrypted and returned or deleted within 30 days of completion, confirmed in writing.
Third parties. Nothing is shared with any other consultant or company without your written consent.
References. Your name or project is never used as a reference or case study without written permission.
Your data. Figures you enter in this site's tools stay in your own browser and are never sent to a server.
How I work
My role and way of working
Who you work with
I do the work myself; proposals, analysis and reports are not handed to a junior team.
Response time
A reply to every request within 1 working day; the 3-risk review within 48 hours of receiving documents.
Site visits
For out-of-town and international visits, travel and accommodation are invoiced at cost, with your prior approval.
Continuity
On long engagements, a backup plan with a trusted colleague is agreed, only with your written consent and under the same confidentiality terms.
T0 · Diagnostic
Contract health test
Answer 10 questions for your project as it stands today. The score shows the risk of lost entitlements and margin erosion; what to do about each weak point is listed below.
Sample answers pre-selected
01
Are all contractual notice periods (claims, VO, EOT) tracked in one calendar?
02
Is every extra instructed in writing (VO) before work starts?
03
Are unapproved VOs and claims kept in an up-to-date register?
04
Is there an approved baseline and a monthly delay analysis?
05
Are payment certificates reconciled with accounting costs every month?
06
Is the estimate at completion (EAC) updated at least monthly?
07
Are bond expiry dates and limits tracked?
08
Do subcontracts mirror main-contract terms (penalties, bonds, notices)?
09
Are site letters and minutes kept in a central document system?
10
Was the handover and final acceptance plan ready in the first third of the programme?
Result
At risk
53/ 100
Priority actions
Calculate EAC and CPI monthly in the budget tool (T3).
Start a VO & EOT register (T5) with date, amount and status per item.
Adopt a no-written-instruction, no-extra-work rule and use a site VO form.
Close cost records on the IPC cut-off date and compare the two figures.
Flow main-contract terms down into subcontracts (back-to-back).
T1 · Tool
BOQ and tender preparation
Enter quantities and unit rates per item; the tender total is calculated with overheads, contingency, profit and VAT. This table is also the schedule of values for the IPC tool.
Advance recovery continues until the full advance is repaid; retention stops once the cap is reached. These rules are modelled on FIDIC Sub-Clauses 14.2 and 14.3; check the particular conditions of your own contract.
T3 · Tool
Budget and profitability control
Enter budget, actual cost and estimate to complete per cost group. Earned value (EVM) indicators and margin are calculated automatically.
Sample data
Cost performance (CPI)0.89Critical
Schedule performance (SPI)0.89Critical
EAC (by CPI)$4,754,545Team forecast: $4,360,000
Planned margin13.0%Revenue $4,850,000
Forecast margin10.1%Difference -2.9 pts
Cost group
Budget (BAC)
Actual (AC)
To complete (ETC)
At completion (EAC)
Variance
Status
$1,275,000
-$25,000
On budget
$675,000
-$55,000
Overrun
$800,000
-$20,000
Watch
$535,000
$5,000
On budget
$740,000
-$20,000
Watch
$335,000
-$25,000
Overrun
Total
$4,220,000
$2,615,000
$1,745,000
$4,360,000
-$140,000
A CPI below 1.00 means each unit of money spent produces less than one unit of work. In this tool, below 0.95 is a warning and below 0.90 is critical.
T4 · Tool
Cash flow and funding gap
Calculates the monthly cash position on an S-curve from contract value, duration, advance, retention and payment delay. The negative area is what the company must fund from its own resources or the bank.
Sample data
Peak funding need$279,757in month 12
Months cash negative11of 21 months
Retention held at end$242,500released after defects period
Cash position at end$194,000excl. retention
Cumulative cash position by month
Funding neededCash positive
Assumptions: progress follows a standard S-curve; costs are paid in the month incurred; the advance is received at the start and recovered from each certificate at the same rate; retention is held (released after the defects period).
T5 · Tool
Variation (VO) and extension of time (EOT) register
Record every variation, extension of time and claim with date, amount and status. Items unanswered for over 30 days are flagged; lost entitlements usually start here.
Sample data
Total submitted$171,9004 items
Approved$38,500Approval rate 50%
Awaiting response$21,4002 items
Over 30 days2need chasing
Time claimed42 daysApproved 0
No
Description
Type
Notice date
Amount
Time (days)
Status
Waiting
Closed
120 days
107 days
84 days
Closed
T6 · Tool
Risk register
Score each risk for likelihood (1–5) and impact (1–5). A score of 15 or more shows red, 8–14 amber, 7 or less green. Every red risk needs an owner and a mitigation.
Sample data
High1
Medium3
Low1
High risks missing owner or mitigation0
Risk
Likelihood
Impact
Score
Owner
Mitigation
16
12
10
9
6
T7 · Tool
Bonds and financing needs
Calculate bond amounts, bank commission costs and the working capital needed at the start of works.
Sample data
Result
Bid bond (3%)$145,500
Performance bond (10%)$485,000
Advance payment bond (15%)$727,500
Peak bond facility required$1,212,500
Bid bond commission (3 months)$909
Performance bond commission (30 months)$30,313
Advance bond commission (9.0 months)$13,641
Total bond cost$44,863
Cost of first 3 months ($266,750/month)$800,250
Working capital needed after advance$72,750
Bond cost / contract value0.92%
The bid bond is assumed open during tendering (3 months), the performance bond for the works period plus a 12-month defects period, and the advance bond until recovery is complete (on average half the duration).
T8 · Tool
Investment share plan
Decide how much of annual net profit goes to investment and how it is allocated. The 3-year effect is estimated with the expected rate of return.
Sample data
New market and country entry%
Equipment and technology (BIM, ERP)%
People and training%
Tendering and business development team%
Allocation totals 100%. Update the rate of return based on the actual results of past investments.
Step lists for pre-construction team and subcontractor planning, periodic audits and handover. Your ticks are saved in this browser.
Pre-construction management team
0 / 10
Why this list matters
If the team is not in place before the first IPC, take-offs, orders and subcontracts slip. Key roles should be appointed at least 4–6 weeks before mobilisation.
04 · References
Selected projects
The site experience behind the advisory work: hotels, airports, mixed-use, healthcare and monumental buildings.
VIP Villa Complex
Design & Build contract; budget, schedule and quality KPI management, coordination of all design disciplines.
176 rooms, spa, 3 restaurants, cable car and 40 ha of landscaping to Marriott brand standards; managing investor, brand and design teams.
Company
Anagi Construction LLC
Location
Tbilisi, Georgia
Years
2019 – 2024
Value
$100M · 54,000 m²
Çiftçi Towers
44-storey twin towers under ARUP oversight with 1,200 workers on site; residential, office and retail fit-out delivered on schedule and to specification.
Company
Perspektif İnşaat A.Ş.
Location
Istanbul
Years
2016 – 2019
Value
$120M · 125,000 m²
Ashgabat International Airport
All architectural finishing works; 15,000 workers and 500 staff, 14 million passengers a year.
Company
Polimeks İnşaat A.Ş.
Location
Ashgabat, Turkmenistan
Years
2014 – 2016
Value
$2.5B · 156,000 m²
Presidential Mausoleum and Mosque Complex
Calacatta stone, handmade mosaic; the first 1,000,000 LTI-free work hours in Gabon's history. Presidential Certificate of Recognition.
Company
ENKA (JV with Bouygues)
Location
Franceville, Gabon
Years
2014
Value
$75M · 20 months
American Hospital
Design-to-site delivery and MEP interface coordination; additional scope at Koç High School and Koç Emergency Hospital.
Five months of preparation for stainless steel parts at ±0.1 mm tolerance, then 20 shops assembled in two weeks. A note on manufacturability and procurement.
In my first job, I spent five months on a problem nobody around me knew how to solve.
We were building shops in Turkey for an Italian brand. The design came from Italian architecture offices; construction was left to local teams. The problem: we could not find a manufacturer who could make the stainless steel parts. They had to be laser cut and fit together mechanically, with tolerances of ±0.1 mm. Our normal site tolerance was 7 to 10 mm.
I did not start by drawing. We went to Italy, photographed finished shops and looked at how they were built. Back in Istanbul I searched for a laser cutting machine. The man who had imported it did not know how to operate it. We brought in a supervisor, trained a technician, prepared the first production drawings in AutoCAD, cut samples and tested them.
Five months later, the samples passed. Then everything moved fast: the equipment for 20 locations was produced in one week, and different teams assembled it in 20 cities in two weeks. The speed at the end was paid for by the slow months at the start.
What did you have to learn from zero before you could deliver a project?
Fill in the form to prepare your request, then send it in one click via WhatsApp, Gmail or your email app. Every request gets a reply within 1 working day.
Request text
Subject: Consulting session request – 3 risks in 48 hours (free, under NDA)
Dear Hüray Özkul,
I would like to request a consulting session.
Topic: 3 risks in 48 hours (free, under NDA)
Meeting format: Online (Zoom / Teams)
Preferred date: Flexible
Kind regards,
[Full name]