BOQ and tender preparation

Enter quantities and unit rates per item; the tender total is calculated with overheads, contingency, profit and VAT. This table is also the schedule of values for the IPC tool.

Sample data: hotel interior works
ItemDescriptionUnitQtyUnit rateAmountShare
$285,6008.7%
$333,20010.1%
$239,2507.3%
$278,4808.5%
$413,60012.6%
$254,2007.7%
$1,214,40036.9%
$270,7508.2%
Total direct cost$3,289,480100%

Tender summary

Direct cost$3,289,480
Overheads (8.0%)$263,158
Contingency (5.0%)$177,632
Profit (10.0%)$373,027
Tender price (excl. VAT)$4,103,297
VAT (20%)$820,659
Tender price (incl. VAT)$4,923,957
Mark-up factor on direct cost1.247

Cost breakdown

A.07 Guest room FF&E (fixed joinery)36.9%
A.05 Bathroom fixtures and sanitaryware set12.6%
A.02 Gypsum board suspended ceiling incl. acoustic panels10.1%
A.01 Ceramic and natural stone finishes (lobby, wet areas)8.7%
A.04 Internal doors, fire rated (EI60)8.5%
A.08 Paint and wallcovering8.2%

If a single item exceeds 30% of the total, verify its unit rate analysis separately; most tender risk sits in a few large items.