Case studies

Each case follows the same order: challenge, approach, result. Figures come from project records; cost details are withheld for confidentiality.

Ashgabat International Airport
Turkmenistan · 2014–2016

Ashgabat International Airport

My role: Finishing Works Manager (Polimeks). Responsible for all architectural finishes, interface coordination and the site team.

$2.5Bproject value
156,000 m²terminal
15,000workers
3continents of supply

Challenge

A fixed opening date, a multi-contractor site and materials from three continents. A one-week slip in finishes threatened the opening directly.

Approach

Finishes were split into zones and packages. Material logistics were tied to the programme. Structural, MEP and airport-systems interfaces were coordinated from one desk, with 500 staff and 15,000 workers.

Result

Finishes were delivered on the government-fixed deadline. The terminal opened with capacity for 14 million passengers a year.

Consulting equivalent: Package Strategy (P5), First 90 Days Set-up (P6)

Presidential Mausoleum and Mosque Complex
Gabon · 2014

Presidential Mausoleum and Mosque Complex

My role: Fit-out Supervisor (ENKA–Bouygues JV). Subcontractor coordination, MEP interfaces, budget, site planning and material logistics.

$75Mproject value
20months
1,000,000LTI-free hours

Challenge

An ENKA–Bouygues joint venture. Calacatta stone, handmade mosaic and fibre-optic ceilings had to be installed at a remote site with a weak supply chain.

Approach

Subcontractor coordination, MEP interfaces, budget control, site planning and material logistics were run in one plan, with daily quality and HSE follow-up.

Result

Completed in 20 months. The first 1,000,000 LTI-free work hours in Gabon's history. Presidential Certificate of Recognition awarded.

Consulting equivalent: Handover Plan (P7), Package Strategy (P5)

Tbilisi Marriott Spa, Wellness & Golf Club
Georgia · 2019–2024

Tbilisi Marriott Spa, Wellness & Golf Club

My role: Project Manager (Anagi Construction). Full lifecycle delivery; coordination between investor, brand and design teams; bridging international standards and local contractor capability.

54,000 m²built area
176rooms
40 halandscaping
5key parties

Challenge

Investor, Marriott, architect (Dephani), interior designer (Hat Design) and structural engineer (Progress LLC) each had different expectations. The scope included a spa, 3 restaurants and a cable car.

Approach

Architectural interface coordination and multi-party stakeholder management ran across the full lifecycle, with works checked against Marriott brand standards.

Result

The 54,000 m² hotel was delivered to Marriott standards with 176 rooms, spa, wellness, 3 restaurants, a cable car and 40 ha of landscaping.

Consulting equivalent: Owner's Representation (P8), Contract Health Check (P3)